¡¡
Servicing
all industries all around the world.
Our boiler repair services includes :
- Complete repair/supply and fabrication
and retubing for all
kinds of boiler ranging from 1 ton/H to over 150 tons/H
- Complete repair/supply and fabrication
and retubing for all
kinds of Economiser/Superheater and HRSG system
- "S" and "U" stamps
activities are conducted in accordance with
the requirements of the ASME Boiler and Pressure Vessel Code
- "R" and "NB" stamps
activities are performed in accordance
with the requirements of the National Board
- New boiler, Supply and tailor made to
suit new boiler system
& design
- 5 days delivery for Economiser Fin Tube
& Fabrication
- Boiler tube material supply
- Boiler tube bending/fabrication
- Class survey
- Boiler washing/refractory/insulation
work
- Voyage/overseas boiler repair
|
An
Introduction to MMI....
Company Profile
GENERAL
Since the beginning of 1994, MMI Boiler Management Pte. Ltd.,
Singapore has focused to provide competent Services for the Repair & Erection of
Marine and Industrial/Land Boiler including Sales and Engineering Assistance to various
industrial and governmental clientele in Southeast Asia and the Pacific Region. Its staff
is composed of multi-disciplined sales, maintenance and design engineers with long years
of experience in their respective fields. When required, the company¡¯s capability
includes installations, commissioning, complete re-tubing, maintenance and turn-key
contracts of equipment that it supplies.
The company¡¯s activities include the servicing, boiler re-tubing, class survey, boiler
tube bending/fabrication, economizer re-tubing, voyage/overseas repair and fabrication
& installation of industrial machinery, pressure retaining items and raw materials
supplies. The in-house sales and engineering services teams are all competent to deliver
the needs of its clients in the Chemical, Petrochemical, Electronics, Food Processing,
Manufacturing, Marine & Power and other Allied Industries.
The office of MMI Boiler Management Pte Ltd is located at 16 Tuas
Crescent Singapore, 638710 with the following contact details:
Tel. No.: +65 6863 6588
Fax No.: +65 6863 4788
Email : mmi@boilermmi.com
Website : http://www.boilermmi.com
SALES AND TECHNICAL SERVICES
MMI Boiler Management Pte Ltd., Singapore maintains a high standard of professionalism in
dealing with its clients and accepts full responsibility for the scope of works under its
management. The Company operates under the Lloyds Quality Management System Standards
conforms to ISO9001:2000 applicable to the Provision of Boiler System and Retubing
Services.Its scope of sales and technical services are:
SALES:
Exclusive
Distributorship:
1. Clayton
Steam Generators, Waste Heat Recovery Systems ¨C
(Ca., USA)
2. Stordy
Industrial Burners ¨C (Brussels, Belgium)
TECHNICAL SERVICES:
MMI is specializes with the following:
Boiler & Steam Generator Management;
| - Boiler Re-tubing |
- Class Survey |
| - Boiler Tube Material Supply |
- Washing,
Refractory/Insulation Work |
| - Boiler Tube Bending/Fabrication |
- Voyage/Overseas Repair |
| - Economizer Re-tubing |
|
- Vertical Water Tube Boilers
- Conventional 3-pass Fire Tube Boilers
- Economizers
- Heat Exchangers
- Two-drum Boilers
- Super Heaters
ENGINEERING AND PROJECT MANAGMENT
- Conceptual and detailed design
- Mechanical/Electrical Engineering
- Civil/Structural Engineering (Option)
- Planning and Scheduling
- Estimating, Cost Engineering
- Preparation of Specifications
- Bid Document Preparation
- Preparation of Contracts
- Quality Assurance
ACCREDITATION:
MMI Boiler Management Pte. Ltd., is
authorized in accordance to the Rules of the American Society of Mechanical Engineers
(ASME) for the Manufacture of Pressure Vessels (the use of the symbol ¡°U¡±), and
Manufacture and Assembly of Power Boilers (the use of the symbol ¡°S¡±)
The Company, is authorized in accordance to the
provisions of the National Board of Boiler & Pressure Vessel Inspectors (NB) for the
Repair and/or Alteration of Pressure Vessels and Power Boilers (the use of symbol ¡°R¡±). It¡¯s also authorized
to apply the ¡°NB¡± mark and register boilers, pressure vessels, or other pressure retaining
items manufactured in accordance with ASME Stamp(s) S, U, with the National Board with its
provisions.
OTHER SERVICES:
- Turn-key projects on exclusive distributorship.
- Equipment Commissioning, Industrial Equipment
- Operation and Maintenance
SALES AND DESIGN / ENGINEERING ACTIVITIES
MMI Boiler Management Pte. Ltd., Singapore, has been commissioned to perform several
projects in the development of conceptual designs for its sales activities and engineering
works in various level of details. The following describes how MMI Boiler Management Pte.
Ltd., system adapts to fit project requirements.
CONCEPT DESIGN
This stage starts with a general overview of the clients project background and objectives
leading to intensive data gathering and field investigations.
1. Meeting
with Owner and/or Owner¡¯s representative to define the project requirements such as specifications,
buildings, foundations, electrical tie-up, layout, mechanical and other auxiliaries.
2. Site
inspection to determine availability of existing infrastructures and resources and obtain
information on Government rules (local rules, depending on which country) and regulations,
which affect project implementation.
CONCEPT PLANNING
This stage shall provide the Owner an opportunity to review and approve MMI Boiler
Management P/L¡¯s concept design prior to proceeding of sales proposal and detailed design. The documents to be submitted
are as follows:
1. Concept Plans and Brochures
These shall
contain sufficient information relative to the owner¡¯s requirement on equipment layout,
specifications, schematic diagrams and equipment description.
2. Cost Estimates
Aside from the
equipment cost, there shall be a budgetary estimate for all other parts of the project
within a defined construction cost limitation, i. e., Mechanical, Electrical,
Civil/Structural, etc.
PROPOSAL AND
DETAILED ENGINEERING
After approval by the owner of the concept, MMI Boiler Management P/L then prepares the
proposal for the equipment sales and after the acceptance thereof shall prepare the
detailed engineering for construction implementation. The following shall be submitted to
the owner:
1.
Basic documents
2.
Complete engineering drawings in ACAD (when required)
Ex. Civil/Structural, Electrical,
Mechanical, etc.
3.
Complete Technical Specifications
4.
Design Calculations
5.
Cost Estimates Supported by bill of Materials
6.
Complete Tender Documents.
7.
Schedule of Activities.
The list of submittals above can be
used by the owner for installation bidding purposes but if the Owner opts to give the
installation to MMI Boiler Management, then the details for such installation can be
arranged for further discussions.
Copyright ?1999,2002,2004,2005 MMI
Boiler Management Pte Ltd. All Rights Reserved.
Last Updated on 5 October, 2005 |